Enlarged Cotter Dam Project at Rapid Albury Wodonga

Enlarged Cotter Dam

Enlarged Cotter Dam

 
 

Cotter dam is the main water storage for Canberra, located approximately 30km west of the city.

This project was undertaken to increase the city’s water storage capacity after a couple of major droughts had Canberra on major water restrictions.

Enlarging the Cotter Dam involved building a new 80 metre high dam approximately 100 metres downstream of the existing Cotter Dam, as well as two substantial earth embankment dams adjacent to the main dam. The new dam has a capacity of 76 gigalitres (GL), nearly 20 times its original size, and the new reservoir will increase the ACT Water storage capacity by 35%.

Rapid was engaged through a subcontractor on the project to supply and install a hydraulic system consisting of a power unit and Hydraulic cylinder to operate a temporary gate within the new wall construction to allow water overflow from the old wall upstream to pass through the new wall construction during construction, but then when no longer required to close this gate and then become redundant within the structure of the new wall.

Enlarged Cotter Dam at Rapid Albury Wodonga
Image

Long story short, we do it all!

So call us or drop in today, you’ll be pleasantly surprised & leave knowing you’ve received some of the highest quality customer service around.

Contact Us

Address: 21 Sanyo Drive, Wodonga VIC 3690

Phone: 02 6056 9068
Email: salesteam@rapidhydraulics.com.au

Hours: Mon-Fri: 7.30am-5pm
Sat: 8am-12pm
Sun: Closed